Forum Replies Created
-
AuthorPosts
-
looking forward to it.
looking forward to it.
Okay, It is time to get back to this project. Shop is cleaned up and dozer will be moved in this week. Disassemble to begin this weekend 12/3/2011. Pics of disassemble to follow soon.
Summer time is orchard time for me. No time to work on the bulldozer project until maybe August. Then it is full time until I get it finished. Goal is to be running again next spring…
Greg
Thanks all for the complements. Shop has it's own 200 amp service and air supply furnished by a IR 5hp 2 stage free standing 80 gal air compressor. Shop is 24 X 36 ft. Very proud of it to tell you the truth.. Shop is kind of messy right now. Going to clean it up some before I back the dozer up into the shop. Oh I forgot. Got a stereo in it too so I can rock out to some classic rock.
PT-400 is a Guilin Product. My Engine is a 295, a two cylinder model. 26HP I think. I used to Live in Stanwood Wa, which is where I bought this unit. Got her washed up this weekend and I am set to start taking her appart.
Before this project I designed and built a 2 ton crain in my shop (saftey factor of 2). Did all the work myself.
Here is one thing I need to fix. I am going to redesign this joint. Crack is both sides of blade arm…
-
AuthorPosts